Sunday, November 28, 2010

Geothermal Energy and the 1st Floor is starting to look liveable!!

Sunday, the 28. November 2010

It has been an exciting 2 weeks on the house front!
Despite weather forecasts to the contrary, the icy front held out, the extra ground got taken away and the geothermal energy collectors were able to be installed.

The view from our Webcam 2 weeks ago.

And then the earthworks started...

A while later...

Next day...

And so on...

Hole for the Geothermal collectors taking shape.

Our swimming pool? No, our heating hole...!

6m x 18m

From the other edge.

The blue on the picture is Geothermal pipes - not much thicker than spaghetti - but like macaroni with a hole in the middle.

Covering up the Geothermal collectors

All gone!

Now this whole Geothermal heating business was very tricky and very weather we had a lot of luck! The pipes have to be soldered together, and for that to work the temperature had to be above 5 degrees. On day 2 of the work the temperature was max 3 degrees - they were using huge heaters to make sure they maintained temperature and did not break. Tricky business. All a little, I'll believe it when I feel it!

3 days later - SNOW!

Today on the property... Still snow, but at least the heating is in.
Inside the house though, there are big things happening!!! Very exciting...

Master Bedroom with plaster on the walls! Finally looking like a house :) 

Other wall in Master Bedroom - like the texture of the walls.

Still Master Bedroom - looking towards entrance, cupboard area and bathroom.

Looking from Bathroom to Bedroom.

Main Bathroom - Toilet 

Kids room

From the Master Bedroom Balcony towards the street - as you can see the huge sand heap is gone and the property has been evened out.



The top of our borehole - pump still to come.


So now we really are on the last legs... 
Don't get me wrong - after we move in there is still going to be heaps to be done, but thats all later.
What is important is what needs to happen before we can move in... 
The following still needs to be done:

This week: Plaster the ground floor, Underfloor heating, Measurements for kitchen
Next week: Designbeton (cement) Floors, Sewage & Water
Week after next: Stair measurements, Electricity in house
Middle January: Stairs installed, Painting walls, installation of Bathrooms
End of January: Move in!
Beginning February: Kitchen gets installed


Projects for the next years are:
Balcony
Terasse
Garden
Carport
Fence
Gate
Entrance area
Paving
Landscaping etc.

I think we will be kept out of mischief for a while yet! Visitors and helpers gladly welcome.